Markham, ON
- Material
- Concrete foundation sections with light rebar
- Volume
- 58 tonnes
- Service
- Full-day concrete crushing
- Result
- Recycled concrete aggregate used for backfill and site grading
- Time
- 8 hours
Project Summary
A demolition contractor prepared the concrete before our arrival and loaded the crusher using their excavator. Metal reinforcement was separated during processing.